Long steel bundles are difficult to move safely when the shop depends too much on forklift handling. That is where risk starts to climb.

Terack gives the warehouse a rack system that works better with crane handling, so heavy pipe and tube stock can be moved with less exposure to unsafe forklift traffic.

Request a Quote

WHS compliant metal pipe storage

Main pain points

Forklift-only handling around long stock creates safety concerns in crowded warehouses. Heavy bundles can be awkward to control, and moving them through tight aisles increases the chance of incidents.

  • Forklift exposure around long stock
  • Hard-to-control heavy pipe bundles
  • Safety audit pressure
  • Unsafe movement in crowded aisles
Overhead crane cantilever rack

Core value

Terack supports safer long-stock handling by giving steel pipe and tube inventory a storage method that works better with overhead lifting. That helps lower forklift reliance and keeps the handling process easier to control under WHS expectations.

It is a practical upgrade for teams trying to reduce risk in heavy material storage areas.

Product features and parameters

Terack is a heavy duty crank-out cantilever rack built for pipe, tube, and long-stock storage.

Item Specification
Product type Crank-out cantilever rack
Use case Steel pipe and heavy bundle storage
Handling Overhead crane or forklift depending on layout
Goal Safer handling and lower forklift dependence
Storage style Heavy-duty cantilever storage

Suitable scenarios

This setup fits steel manufacturing groups that need to improve handling safety and satisfy audit requirements for long-stock storage.

  • Safety audit upgrades
  • Crane-assisted pipe handling
  • Heavy steel bundle storage
  • Forklift risk reduction
Safe heavy steel bundle handling

Delivery method

Terack is supplied as a standard rack system that can be installed on site. Share the material size and the heaviest bundle weight, and a layout and quote can be prepared around that load.

Recommended products

Tell us your material size, expected quantity, and required delivery date. We will review the layout and send back a practical response.