High-mix, low-volume molding plants run on changeovers. If every mold swap depends on a shared crane or a forklift queue, the machine waits and the delivery schedule slips.
Erack keeps molds beside the machine and gives the operator a direct lifting path, so storage, pickup, and installation can happen in one working zone.
Main pain points
When the rack is far from the machine or the lifting equipment is shared, changeovers take longer than they should. That hurts dispatch timing and makes the whole cell less predictable.
- Waiting for shared crane access
- Long travel between mold storage and press
- Too much downtime during frequent changeovers
- Hard to keep SMED timing consistent
Core value
Erack supports flexible injection mold handling with a machine-side storage position and integrated hoist workflow. That makes it easier for one operator to move from storage to lifting to changeover without extra waiting.
It is a practical fit for lean teams that need faster swaps and better control of high-frequency production.
Product features and parameters
Erack is a heavy-duty mold rack system built for SMED and machine-side use.
| Item | Specification |
|---|---|
| Product type | Heavy-duty mold rack |
| Use case | Machine-side mold storage and quick changeovers |
| Handling | Overhead hoist / crane depending on layout |
| Goal | Lower downtime and faster mold change |
| Storage style | Drawer-style heavy mold storage |
Suitable scenarios
This setup fits high-mix molding cells that need to reduce changeover delay and keep production flowing.
- Frequent mold changeovers
- Lean improvement programs
- Machine-side storage upgrades
- Fast-response production cells
Delivery method
Erack is supplied as a standard rack system that can be installed on site. Share the mold size and the heaviest load, and a layout and quote can be prepared around that load.
Recommended products
Tell us your mold size, expected quantity, and required delivery date. We will review the layout and send back a practical response.