Suspension and shock absorber plants often switch molds many times to match OEM demand. When every lift depends on the shared overhead crane, the press waits and downtime increases.

Erack keeps the next mold beside the machine and gives the operator a local lifting workflow, so storage, pickup, and installation stay in one machine-side zone.

Request a Quote

Mold rack with integrated hoist

Main pain points

Waiting for the plant crane creates a queue that slows each mold swap. In a high-mix production environment, that waiting time quickly turns into lost output and weaker schedule control.

  • Shared crane access causes delays
  • Downtime increases during frequent changeovers
  • Travel between storage and press is too long
  • SMED targets are harder to maintain
SMED die storage system

Core value

Erack supports faster changeovers by integrating lifting into the local storage workflow. That helps one operator move from storage to pickup to installation with fewer handoffs and less delay.

It is a practical fit for lean teams that want a machine-side setup instead of a plant-wide crane queue.

Product features and parameters

Erack is a heavy-duty mold rack system designed for machine-side access and SMED support.

Item Specification
Product type Heavy-duty mold rack
Use case Machine-side mold storage and quick changeovers
Handling Overhead hoist / crane depending on layout
Goal Lower downtime and faster mold change
Storage style Drawer-style heavy mold storage

Suitable scenarios

This setup fits suspension and shock absorber molding operations that need faster changeovers and local lifting support.

  • High-frequency mold changeovers
  • Lean production upgrades
  • Machine-side storage layouts
  • Downtime reduction projects
Quick mold change storage system

Delivery method

Erack is supplied as a standard rack system that can be installed on site. Share the mold size and the heaviest load, and a layout and quote can be prepared around that load.

Recommended products

Tell us your mold size, expected quantity, and required delivery date. We will review the layout and send back a practical response.